FastBeam: Faster bridge repair methods
FastBeam addresses the challenge to respond to increasing maintenance backlog of bridges is huge in Europe. Traditional bridge repair methods cannot handle the maintenance in a manner that is fast and cost effective enough.
€50 k
in funding
Key numbers
About the project
Traditional bridge repair methods cannot handle the maintenance in a manner that is fast and cost effective enough.
The fast bridge repair process is crucial as the bridges are an important transportation link in modern societies. Closing lanes for repair can have major impact on the local or wider economy.
Special focus will be on German and Scandinavian markets.
Impact of the project:
The project aims to tackle the challenges of environmental pollution and resource depletion, health concerns from toxic chemicals in conventional adhesives and economic instability due to reliance on non-renewable raw materials.
Funding instrument Horizon 2020 SME instrument phase 1

Spinverse’s role
Spinverse strongly supported in project planning, funding proposal writing and evaluation of the quality of the proposal before submission.
After a positive decision from EU Commission, Spinverse supported FastBeam in the project negotiation phase.
We share what we learn